GIBRALTER, REPAIRS AND MAINTENANCE
Jobs to be done in Gibralter included adjusting the balast of the boat with extra wine and beer. The teak deck needed recaulking in the heat and the bosun/first mate took that job on. As engineer I had to do the oil change and filter changes on the engine. In order to ensure cold beer for the rest of the passage the fridge needed regassing. Emptying the locker was the hardest part of this task.